Vipend House, Jelah
"Vipend house" is a small house in a not so small location. The position, context, wishes and budget of the investors were key in forming the program of this prefabricated facility near the small
"Vipend house" is a small house in a not so small location. The position, context, wishes and budget of the investors were key in forming the program of this prefabricated facility near the small
The building is positioned in one of the axes of the city with a special residential function, but also institutional. During the drafting of the project, the careful approach towards the existing condition of
TIBA Studio has undergone significant changes in recent years, leading to the need for a new office. We needed a space that supports our own rethought, more efficient operation, and represents the values and
Amber Hotel was a very interesting and challenging project. An existing concrete structure built in 2004 had to be transformed in a more than forty rooms hotel. Located in less than 300 meters from
The choice of construction material was unambiguous for the headquarters of a company focusing on wood processing and firewood production. Wood is an integral part of the company's identity, so the design of the
The aim was to build a house in rigidly limited space, surrounded by walls of adjoining constructions in central part of the city. "Goal" of the author has been also constrained by the modest
The “Acer“ house, situated on a picturesque hill, in Hancesti, is a bespoke design for a middle-aged family. The house is the axis around which the daily life of the family revolves. The core
Corresponding to the family culture, in which great reunion always happens, the house was designed to allow family’s reunions and accommodate a great number of family’s friends. Due to sloping plot area, the house
The building ensemble is located in a hamlet of Enneberg at a height of 1,200 meters and it refers to the building tradition of the “viles”. The two staggered buildings with their cautious insertion into
Hungary’s largest cutting-edge, build to suit headquarters and office development to date - as well as one of the country’s most innovative, eco-conscious office buildings, completed for Magyar Telekom and T-Systems Hungary. It provides
The concept behind the hotel entrance area is to create a new line of communication which links the public area in front of the hotel to the hotel lobby in a fluid manner. This
Original collective garage project at the southern edge of Čelákovice was completely transformed into an apartment building with a semi-open courtyard. A simple, functional concept which was finally realised after many years’ preparation. The
For the careful renovation of the two schools Landsteinergasse and Wiesberggasse, a complex design was used to create a connection between the schools, which are located on different levels. This connection includes two new gymnasiums
This project aims to make school trips in an ecological environment more affordable. That is why the hotel is built of regional wood which forms a solid wood construction. The hotel is heated by
Located in south Tel Aviv, a degraded area experiencing rapid transformations, the apartment complex introduces much needed housing and street-front commercial spaces, while preserving fragments of the existing structure. Moving away from the characteristic Tel
The idea of the design was to revitalize the fragment of the former barn situated in the southern area of the village. Its new main function is to serve as a technical facility (modern
Concept The design won an open international architecture competition in 2013. The concept envisages the integration of an urban office building into a historical environment while taking a distinctive and contemporary approach. Although manifesting
The urban character of the new buildings pays homage to the brushstroke and the rhythms of the existing city. Widenings and narrowings between the individual elements define clear urban spaces and spatial sequences: opposite the
The newly erected after-school care building provides space for five after-care groups. Inside the wooden frame construction, fir wood glazed with white oil creates a bright atmosphere that contrasts with the terrazzo artificial stone
The building site is in Hagenberg im Mühlkreis, a municipality with 2800 inhabitants in the Mühlviertel. On the property there is already a single-family house built in the 1980s. Another wooden building was to
Project description The redesign of the town-center of Ködnitz is a process that began in 1996 with the implementation of a invited expertise proceedings. As a result of this architectural competition first the Glocknerhaus
The solid wood construction occupies a topographically difficult plot, makes use of the hillside location and ensures garden access for the toddler groups on the basement and ground floor. The east-side access area docks
The client wants to extend the existing restaurant, buffet ant kitchen at hotel Breza in Podčetrtek. An extension is made to an existing extension at the corner of the building. Design concept: The "essence"
The new Agriturismo La Barberina is generated from the renovation of 2 contiguous buildings dating back to 1700. The construction of a new accommodation facility, in a small rural center that has lost its
A house is a message and a place where one can find help. The smell, the atmosphere and the hubbub of the school will stay with us even after decades, because it is „our
The Slovenian Istria Ankaran Centre is intended for the residence and care of people with medium, severe and very severe mental disabilities. It is located in the idyllic environment of the Mediterranean park of
Imagining a villa, one pictures a sprawling complex of buildings and land, echoing dynastic opulence. For this villa commission in a quiet village outside of Vienna, Austria, I was challenged with maximizing the volume of