The project aims for both volumetric and conceptual integration with the adjacent Vázquez Molezún warehouse. To achieve this, it breaks away from conventional industrial typology by incorporating arched forms and a textile-inspired envelope that blurs the façades, exploring the interplay between transparency and opacity.
Technically, the design prioritizes prefabrication and energy efficiency. Its structure and double skin – composed of perforated zinc and polycarbonate – were manufactured off-site and assembled on location. The façade allows natural light to filter in while regulating direct solar radiation, optimizing the building’s energy performance.

Credits
Architecture
Client
MAYORAL MODA INFANTIL SAU
Year of completion
2023
Location
Málaga, Spain
Total area
18.835,65 m2
Site area
26.233 m2
Photos
Fernando Alda
Project Partners
Engineering: CEMOSA
Construction: SANDO
Installation: STC, PACISA
Main fabricators: Metaldeza, El Zinc, Danpal (Palplastic), Europerfil, BMI, Assa Abloy, Porcelanosa