July 2020
Hotel Saltus, Jenesien
Take a deep breath, relax, feel the forest, be grounded – that’s what the client asked for in the briefing for the newly constructed Hotel Saltus. Every selected material, every aesthetical decision was made in
FH Redesign, Sarajevo
The house in question is located in the part of Sarajevo called Pofalici. Our task was to expand the existing building and redesign it so that the roof remains intact. It was a great challenge
Carabinieri headquarter, Saluzzo
The project includes an expansion of the Carabinieri barracks in Saluzzo, by building adjacent to the existing building a new construction height two floors. The building, coated copper plates, is oriented to represent, in the
Continuous extension, Sesto
Strata Hotel was completed in 2007: a subtle volume of horizontal wooden larch sticks that peel off the building, run over it, and seem to grow out of the surrounding topography. In 2014, to
The Walkable Summit Journal, Sexten
The summit book is written proof of heroic deeds in the mountains. Each spectacular first climb told of courage, great ambition, mental strength and technical ability – not to mention a certain measure of madness.
House L, St. Martin – Gsies
In a terrain sink, on a small property with an old silver fir in its center, a L-shaped bungalow-like building is positioned, which stages the view to its garden. The new volume separates itself