Turkuaz Textile
The building has a total of 5 entrances (exits) for loading and unloading works, as well as the necessary pedestrian approaches from all facades, tailored to the flow of people and fire and evacuation
The building has a total of 5 entrances (exits) for loading and unloading works, as well as the necessary pedestrian approaches from all facades, tailored to the flow of people and fire and evacuation
The assembly workshop is integrated with adjacent sanitary, administrative, and storage areas, complemented by a checkpoint to regulate car and pedestrian access throughout the property. Outside the enclosures, parking spaces for a total of
The project started in 2018, with a complex of buildings for the formation of a new enterprise with all the necessary engineering infrastructure for its operation. Anarchitectural concept has been developed on the basis