Proměna zámeckých pivovarských prostor na bazén a spa

Reconstruction of the castle’s brewery cellars into a spa area with a swimming pool – cellars are part of the castle complex, which we have been involved in renovating since 2014, were built in 1731. They have 465,3 m2, and the main mass of the space is made up of three barrel vaults, which differ both in size and in the materials used. The biggest problem, in addition to the insensitive 20th-century modifications, was the humidity of the 3rd loggia, which is 8,96 meters underground and under the road.

We worked with great respect for everything historical and valuable. We considered the use of all materials very carefully – their appearance, age, processing and size were considered in relation to our space – we supplemented the old sandstone and limestone with crystal (illuminated huge slabs used on newly inserted elements). The black pool connects and at the same time separates all three loggias. The water surface in combination with the dark color works as a mirror. You can go around the pool using two wooden footbridges at both ends of the pool.

Credits

Interior
Mimolimit s.r.o.; Barbora Škorpilová

Client
Private

Year of completion
2022

Location
Czech Republic

Total area
465,3 m2

Photos
Filip Šlapal

Project Partners

AED Project; Ales Marek, Alston; Jan Sulcek